RATE STUDIES & REPORTS 2021 Water Rate Study 02/2019 - Emery & Garrett Groundwater: Final Report – Preliminary Evaluation of The Feasibility to Artificially Recharge the Aquifer at the MVD-4 And MVD-5 Well Field 02/2019 - Information from the 2/25/19 Public Hearing: Meeting Video Underwood Engineers Presentation – ‘Evaluation of PFAS Treatment Wells 2, 3, 7, & 8’ Slideshow (pdf) Rosemarie Rung Presentation –‘Petition Warrant Articles: Filtering Merrimack’s Water’ Slideshow (pdf) Report for PFAS Treatment Feasibility Study 2018 Water Rate Study 03/2017 - Barr Engineering Co Report for MVD Supply Wells 4 and 5 Asset Management Plan (Final 11/2014) 05/2012 - Sodium & Chloride Loading Study for MVD's WHPA's